NEW QUESTION # 30
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000. Actuals of 10000 were posted in the previous year. You are surprised to realize that a purchase order of 1000 was created for this internal order in the current year. How is that possible?
Note: There are 2 correct answers to this question.

  • A. The difference of 1000 is within the tolerance limits defined in the configuration.
  • B. The purchase order has NOT generated a budget relevant document yet.
  • C. The purchase order was entered in a different year than the budget.
  • D. The cost account is exempted from budget availability control.

Answer: A,D

Explanation:
Detailed Explanation: The budget availability control allows a purchase order if the amount falls within defined tolerance limits (option B), or if certain cost accounts are exempt (option D). These settings provide flexibility within budget controls for different fiscal years in SAP S/4HANA.


NEW QUESTION # 31
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.

  • A. The availability of funds in object currency
  • B. The availability of funds according to tolerance limits
  • C. The availability of funds using overall plan value
  • D. The availability of funds on period level

Answer: A,B


NEW QUESTION # 32
What master data objects can you set up using time-based fields?
Note: There are 2 correct answers to this question.

  • A. Cost centers
  • B. Statistical key figures
  • C. Activity types
  • D. Cost elements

Answer: A,C

Explanation:
Detailed Explanation:Time-based fields in SAP S/4HANA are essential for configuring cost centers and activity types, allowing changes in validity periods and assignments. This enables better tracking and management of resource planning over time.


NEW QUESTION # 33
In which module do you process profit center allocations in SAP S/4HANA?

  • A. Account-based profitability analysis
  • B. General ledger accounting
  • C. Product cost accounting
  • D. Cost center accounting

Answer: A

Explanation:
Detailed Explanation:Profit center allocations are managed within account-based profitability analysis in SAP S/4HANA, ensuring alignment of profitability and cost management with financial accounting.


NEW QUESTION # 34
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?

  • A. Costing type
  • B. Reference variant
  • C. Transfer control
  • D. Costing version

Answer: C


NEW QUESTION # 35
To which object can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.

  • A. Asset
  • B. General ledger account
  • C. WBS element
  • D. Network
  • E. Sales order item

Answer: C,D,E


NEW QUESTION # 36
To which object do you assign a costing sheet?

  • A. Valuation variant
  • B. Transfer control
  • C. Cost component structure
  • D. Costing variant

Answer: A


NEW QUESTION # 37
To which objects can you settle an internal order using cost elements with cost element category 21 (internal settlement)?
Note: There are 3 correct answers to this question.

  • A. Asset
  • B. General ledger account
  • C. WBS element
  • D. Network
  • E. Sales order item

Answer: C,D,E

Explanation:
Detailed Explanation: Internal orders in SAP can be settled to various cost objects, including networks (option B), sales order items (option C), and WBS elements (option D). These are key objects for cost management, allowing for detailed tracking and settlement in project and order management scenarios.


NEW QUESTION # 38
What can you configure in the settlement profile? Note: There are 2 correct answers to this question.

  • A. Determine whether settlement is required.
  • B. Define document management parameters.
  • C. Define a number range for settlement document.
  • D. Determine an overhead key.

Answer: A,B


NEW QUESTION # 39
Which scenarios can be covered by one single costing run?
Note: There are 2 correct answers to this question.

  • A. Inventory cost estimate of all the materials in one plant
  • B. Standard cost estimate of all the materials in all company codes of a controlling area
  • C. Standard cost estimate of all the materials in all controlling areas
  • D. Current cost estimate of all the materials in one plant

Answer: A,B

Explanation:
Detailed Explanation: A single costing run can handle inventory cost estimates for materials in a single plant (option B) and standard cost estimates for all materials within a controlling area's company codes (option D).
This functionality optimizes cost estimations across production locations in SAP S/4HANA.


NEW QUESTION # 40
You want to use a template to consider overhead during product costing. How do you assign the template to your material?

  • A. Using a costing key and an overhead key
  • B. Using an origin group and an overhead group
  • C. Using a cost component group and an overhead group
  • D. Using an overhead group and an overhead key

Answer: D

Explanation:
Detailed Explanation: An overhead group and an overhead key (option B) are assigned to include overhead costs in product costing. This assignment enables the application of pre-defined overhead rates in SAP S
/4HANA, facilitating accurate product cost calculations.


NEW QUESTION # 41
You are creating a new activity type and want to maintain plan prices for a cost center. Which attributes must you configure in the activity type master record?
Note: There are 3 correct answers to this question.

  • A. CO version
  • B. Output quantity
  • C. Valid cost center categories
  • D. Price indicator
  • E. Activity type category

Answer: A,C,E

Explanation:
Detailed Explanation: For maintaining plan prices of a cost center, the activity type master record should include the CO version (option B), valid cost center categories (option C), and the activity type category (option D). These attributes ensure accurate cost allocation and pricing within SAP S/4HANA.


NEW QUESTION # 42
Which of the following steps are part of the procedure to update the standard price of the material? Note: There are 2 correct answers to this question.

  • A. Archive the cost estimates.
  • B. Mark the cost estimate.
  • C. Split the costs.
  • D. Release the cost estimate.

Answer: B,D


NEW QUESTION # 43
You create a new profit center. Which company code(s) is it assigned to by default?

  • A. All company codes with document splitting activated.
  • B. The company codes reporting to the same segment.
  • C. The company code of the assigned cost center.
  • D. All company codes within the controlling area.

Answer: D

Explanation:
Detailed Explanation: By default, a newly created profit center is assigned to all company codes within the controlling area (option A). This setup aligns with SAP's universal journal structure, facilitating consistent reporting across company codes.


NEW QUESTION # 44
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Set the relevant indicator in the planning profile of the order type.
  • B. Set the relevant indicator in the internal order master record.
  • C. Set the relevant indicator in the controlling area.
  • D. Set the relevant indicators in the CO version.

Answer: B,D


NEW QUESTION # 45
You are implementing SAP S/4HANA, and you want to run analytical reports off a single data model. How is data reported on in SAP S/4HANA?

  • A. Reporting on data is available in near real-time for aggregated tables.
  • B. Reporting on data is available in real-time only for aggregated level of detail.
  • C. Reporting on data is available in real-time if in conjunction with SAP BW/4HANA.
  • D. Reporting on data is available in real-time at every level of detail.

Answer: D

Explanation:
Detailed Explanation: SAP S/4HANA provides real-time reporting at every level of detail (option B) byleveraging the Universal Journal, which consolidates various data types, supporting comprehensive and timely data analysis without additional ETL processes.


NEW QUESTION # 46
How can you populate local variables in Profitability Analysis reports?

  • A. By user exit
  • B. By populating from user parameters
  • C. By Business Add-In
  • D. By user entry during report execution

Answer: D


NEW QUESTION # 47
Which of the following can you use to explore released APIs?

  • A. SAP Business Accelerator Hub
  • B. SAP Integration Suite
  • C. SAP Application Interface Framework

Answer: A

Explanation:
Detailed Explanation: The SAP Business Accelerator Hub (option C) is the platform where users can explore released APIs for various SAP applications, including SAP S/4HANA, facilitating seamless integration and extensibility.


NEW QUESTION # 48
You want to use template to consider overhead during product costing. How do you assign the template to your material?

  • A. Using an origin group and an overhead group
  • B. Using a profit center and an overhead key
  • C. Using a special procurement type and an overhead group
  • D. Using an overhead group and an overhead key

Answer: D


NEW QUESTION # 49
......


SAP C-TS4CO-2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Product Cost Planning: This topic discusses product cost planning, cost elements structure, cost component structure, planning requirements, costing variants and multi-level costings.
Topic 2
  • Reporting: It covers general reporting requirements for cost centers. Moreover, the topic discusses cost center reporting, drill-down reports, and painter reports.
Topic 3
  • Organizational Assignments and Process Integration: The topic focuses on cross-company code design, production execution, sales pricing, inbound freight, stock transfers, and transfer pricing.
Topic 4
  • Managing Clean Core: The topic discusses process agility, adaptation efforts, and acceleration of innovation.
Topic 5
  • Cost Center Accounting: The topic focuses on cost centers, cost center hierarchies, and cost center groups. Furthermore, it discusses planning functionality, accounting activity types, cost center characteristics, and period end closing for CCA.

 

New C-TS4CO-2023 Test Materials & Valid C-TS4CO-2023 Test Engine: https://actualanswers.pass4surequiz.com/C-TS4CO-2023-exam-quiz.html